
At F.A.M.E. Health Labs, a stock formula takes 6 to 8 weeks after sample approval, and a custom formula's first run takes 8 to 10 weeks from deposit and label approval. Reorders of 30,000 units or more take four weeks. Gummies and softgels run longer: plan on about 18 to 20 weeks from quote to a finished first order, depending on the formulation.
This page explains where that time goes, what adds time to a first run, and how to shorten it.
Before production, you approve a sample. Samples take 3 to 6 weeks in any format, including capsules, liquids and gummies. You can test one version with up to three rounds of revisions, or three versions side by side with one round. Samples are paid, with part of the fee credited to your first order.
A custom formula moves through five steps: the concept, ingredient sourcing (one to two weeks), a prototype prepared at production scale under cGMP (about two days), a stability assessment at 40°C and 75% relative humidity, and validation, which ends with the Master Manufacturing Record that production follows.
Once the sample is approved, our R&D team writes the Master Manufacturing Record and you receive the final quote. The lead time starts when the order is signed and the deposit is paid. Powders and liquids also wait for your approved label artwork, so send final labels as early as you can.
Every batch is tested in-house on our Cedartown, Georgia campus and ships with our certificate of analysis. A standard microbial panel (aerobic plate count, yeast and mold, E. coli) is included on every batch. Because the lab is on the same campus, batches don't wait in an outside lab's queue.
Tell us your format and quantity and we'll give you a timeline with your quote. Request a quote; we reply within 24 to 48 hours.
At F.A.M.E. Health Labs, a stock formula takes 6 to 8 weeks after sample approval, and a custom formula's first run takes 8 to 10 weeks from deposit and label approval. Reorders of 30,000 units or more take four weeks. Gummies and softgels run longer: plan on about 18 to 20 weeks from quote to a finished first order, depending on the formulation.
3 to 6 weeks in any format. You can test one version with up to three rounds of revisions, or three versions side by side with one round. Samples are paid, and part of the fee is credited to your first order.
A first run includes work that a reorder skips: sourcing ingredients, developing or adjusting the formula, testing, label approval and trademark clearance. Once those are settled, repeat runs only need production time.
The production clock starts once you approve the formula, sign the order and pay the deposit. Powders and liquids also need your approved label artwork before production can begin.
Full-service supplement manufacturing, from stock formulas and private label to custom, co-manufacturing and bulk.
Global raw material sourcing, proprietary blend development, MOSA Organic, Halal and Kosher flavor systems.
ISO/IEC 17025 accredited testing ingredient and finished product. COAs accepted globally by FDA, Health Canada, and EU.
Full-platform commercial partnership for high-volume brands. Dedicated team, VP-level account management, real-time portal.